CDM Contractors
Proposal: Brendoncare
This page is private and can only be accessed via the link sent to you.
Overview
Produce a collection of digital marketing content for CDM Contractors, documenting their project with Brendoncare in Alton. They will be carrying out a full replacement of a commercial kitchen in an operational care home in Alton, East Hampshire, that currently houses 100+ residents.
Here’s an example of previous work we’ve produced with a similar style that we think could work really well for this project, showcasing the completed works.
Notes to consider
12-week construction program
A temporary kitchen will be installed to minimise disruption to the care home while work on the main kitchen is ongoing
We already obtained floor plans and 3D models of the new kitchen
We will have approximately one week once the new kitchen is completed before it is in use - this will be an ideal time to capture any ‘after’ content
The content captured across the 3-month program will serve as a portfolio of works, brand builder through labour-focused content, and relationship builder between CDM Contractors and other contractors involved in the project.
Here are some other examples of previous work we’ve produced with a similar style that we think could work really well for this project, showcasing the completed works.






-
Full rip-out
Underfloor heating
Drainage
Suspended grid ceilings
Extraction unit
Stud walls
Fire door installation
Hygiene panels (white rock) going across the walls
Vinyl flooring
Bespoke built stainless steel kitchen coming from Lithuania (HCE)
Lighting and electrics
Plumbing
Decoration
Key Dates
-
15th January 2025
Pre-start meeting
-
20th January 2025
Temporary kitchen installation & site set-up begins
-
24th January 2025
Temporary kitchen installation complete and ready to use
-
27th January 2025
Full construction program begins
-
19th March 2025
HCE attendance to install kitchen
-
2nd April 2025
Clean and clear site
-
4th April 2025
Handover date of main kitchen
-
11th April 2025
Project handover
Deliverables
Photography
Before & after comparisons (minimum 15 edited images)
Progress shots throughout the construction program, particularly of HCE kitchen installation (minimum 10 images)
CDM Contractors labour in full PPE, in-action (minimum 5 images) - only applies if CDM Contractors staff are present on the day of HCE kitchen installation
Videography
Before & after comparisons (1x 45secs approx.)
Full fly-through of the completed works (1x 1min approx.)
A walkthrough of the full project from Kyle at the beginning, middle, and completed stages (1x 1min 30secs approx.)
Full review of the project once work is complete, incorporating CDM Contractors, HCE, and the client on camera. This will take the audience through the story of the project and guide them through the journey from beginning to end (1x 1min 30secs approx.)
Testimonial short series from the client (2x 30secs approx.)
Quote
Payment Terms
An invoice will be sent for a deposit of 50% in advance of the project commencing, and the outstanding amount will be payable on delivery of the completed deliverable(s). We have 14-day terms. Mileage exceeding 50 miles from PO5 1ET will be charged at 45p per mile. Any additional travel expenses will be billed on the delivery of the completed deliverable(s) or once the monetary value reaches £250.00 or more (whichever comes first). We accept payment online or via cheque. Cheques are to be made out to BOUNCEBACK MARKETING LIMITED and online details will be provided on our invoice(s).